COMPANY / CLIENT PROJECT DESCRIPTION PROJECT DURATION
Ministry of Internal Affairs Essential and current repair works in the Administrative Building of the Ministry of Internal Affairs 20.06.2024 – ongoing
Construction and Supply Department near the Ministry
of Economy of the Republic of Azerbaijan
Demolition of existing buildings and Construction of new warehoses locate in Nerimanov dist., Settlement 205, Kondelen street 7 14.06.2024 – ongoing
Heydar Aliyev Foundation Different Construction works in Shusha city 01.05.2024 – ongoing
“İntergas” LLC Works on retaining wall restoration of the recreation complex located in Shamakhi city Yuxari Khinisli village 25.04.2024 – ongoing
Hyoon Co.Ltd Repair and restoration works 22.12.2023 – ongoing
Ministry of Internal Affairs Major repair works, purchase and installation of equipment in the Head Administrative Building of the Ministry of Internal Affairs 29.03.2023 – 01.12.2023
Ministry of Internal Affairs Current repair works in the Administrative Building of the Ministry of Internal Affairs 29.03.2023 – 01.12.2023
“Facility Management Group” LLC Elektrical and installation Works at 3 Projects – Gumush Residence, Dalga Plaza and R/Bunyadov street 15.09.2023 – 18.12.2023
Private Project Construction of mini factory located in Shamakhi city Yuxari Khinisli village 10.07.2023 - ongoing
Private Project Construction, repair and finishing Works of the cottages located in Shamakhi city Yuxari Khinisli village 03.02.2023 – ongoing
UNI Construction MMC
(VÖEN: 1504593391)
Different Construction works in Shusha city 01.03.2022 – 15.02.2024
XXI Century International Education and Innovation Center Reconstruction of of entrances to the Laboratiry located at the territory of the school 25.07. 2021 – 01.12.2021
Ministry of Internal Affairs Reconstruction of the Auxiliary Building located in the administrative building of the Ministry of Internal Affairs Azerbaijan Avenue 7 16.12.2020 – 29.12.2022
MIA General Department of Logistics Construction of a new administrative building on the territory Head Department to Combat Organized Crime 02.12.2020 – 30.12.2022
"Workplace Interiors" LLC Creativity Center for the Disabled located at Nasimi district, Javadkhan str., 13 – Fencing, Foundation Excavation and Concrete Works 21.08.2020 – 05.11.2020
Baku Oxford School Construction of dormitery for girls located in Baku Oxford school 03.02.2020 – 10.02.2021
"ASK INSHAAT" LLC Repair of the multistoried residential building including 1st floor of Non-Residential area located at Yasamal Settlement, intersection of L.Tolstoy, streets 12.11.2019 - 20.05.2020
"IM GROUP" LLC “BİR - İKİ DONER SHOP” repair and refurbishment of coffee shop 05.11.2019 – 01.03.2020
"Grand-Agro" LLC Fencing of the area and gates installation – extension of previous contract due to some additional areas not included to the Project 02.05.2019 – 01.10.2019
"XXI Century International Educational and Innovation School" LLC Repair and refurbishment works 14.06.2019 – 02.09.2019
"LANDAU SCHOOL" Secondary School LLC HVAC and air-conditioning system supply and installation 25.04.2019 – 02.09.2019
"Azerbaijan Greening and Landscape Structure" Open Joint-Stock Company under the Ministry of Ecology and Natural Resources of AR Improvement of ecological condition of the Chukurdar lakes and landscape restoration 14.10.2018 – 26.06.2019
"Baku Hotel Company" Baku, Azerbaijan Construction works In the frames of HYATT Regency Fitness Club Refurbishment 06.04.2018 – 10.05.2019
"Grand-Agro" MMC Fencing of the area and gates installation – 750 Ha 03.09.2018 – 30.06.2019
AZƏR-TÜRK BANK ASC Repair and refurbishment works 12.11.2018 - 30.11.2018
"Rabitəbank" ASC Repair and refurbishment works at Nasimi branch of the bank 26.12.2017 - 18.03.2018
State Transportation Agency of the Republic of Azerbaijan Repair of the building of the Agency located in Sabunchu Settlement, Baku 08.12.2017 – 01.06.2018
“AZENCO” ASC Mingechavir city, Azerbaijan Construction of new Hydropower plant in Mingechavir city 17.10.2017 – 25.12.2017
“QLOBUS İNTERNEYŞNL” LLC Water Supply and sewage system works in Qakh city (construction of control panel d = 110-160 mm. length 14,4 km) 27.08.2017 – 29.12.2017
"Korpu-Bina-Tikinti" MMC Water supply and sewage system installation in Yardimli city 01.02.2017 – 15.08.2017
Ministry of Tax of AR Maintenance of the artificial waterfall and green park area in front of the building of Tax Department 01.11.2017 – 01.11.2018
AzeriCard Repair of 6-storied building of Bank 01.12.2015 – 30.07.2017
BTB Bank Repair Works 01.06.2015 – 21.10.2015
"ServicePlus" MTK Baku, Azerbaijan 01.10.2014 - stopped
Public Agency for Preservation of Cultural Heritage, Oghuz city, Azerbaijan 21.04.2014 - stopped
"ALFA CONSTRUCTION" LLC, Zagatala city, Azerbaijan Construction, refurbishment and repair of the kindergarten to be located at the Residential Complex in Zaqatala city, Azerbaijan Avenue108 01.04.2014 - 15.11.2014
"CPC" LLC, Azərbaycan, Oghuz Construction of the Second Production Building of the "Glukoza" factory in Oghuz city and Administrative building 01.04.2014 - 07.09.2015
"CITY DEVELOPER" Bakı, Azərbaycan Demolition of the existing buildings and construction of a new 8 blocks 9-storied buildings at Tolstoy and H/Aslanov streets 06.02.2014 - 11.02.2015
ACCESS BANK QSC Repair works 27.01.2014 - 12.05.2014
"İNTERGLASS" ASC AZƏRBAYCAN, BAKI ŞƏHƏRİ Construction of a new 7920 m2 warehouse at the territory of "İnter Glass" factory 07.01.2014 - 31.03.2014
"GUSAR OLIMPIC" LLC Reconstruction and strengthening of the existing building of Olimpic Sport Complex 01.10.2013 - 30.05.2015
"GENERAL CONSTRUCTİON" LLC Reconstruction and design of "HARVEY NİCOLS" Brand Shop located in "Globus Plaza" 01.08.2013 - 01.03.2015
"SAHIL AZ KO" MTK Preparation of the manual for exploitation and as-build drawings for existing systems in Jumeirah Bilgah Beach Hotel (HVAC system, security system, etc.) 31.05.2013- 20.06.2014
"GENERAL CONSTRUCTİON" LLC Repair of the rooms in GLOBUS PLAZA HOTEL 24.04.2013 - 01.07.2013
"GUSAR OLIMPIC" LLC Engineering-investigation works. Laboratory works. Testing of construction materials. 17.04.2013 - 31.08.2013
"BANK TECHNIQUE" LLC Reconstruction and essential repair works at the Head-office 28.06.2012 - 20.02.2014
"İNTERGLASS" LLC AZERBAIJAN, BAKU Construction of second oven in the Production Shop and foundation for equipment at “INTERGLASS” LLC, located in Qaradagh district, Salyan Highway 25 01.03.2013- 15.06.2015
EXECUTIVE POWER OF SHEKI CITY, AZERBAIJAN Construction of a new Summer Theatre in Sheki 01.06.2012 - 15.09.2012
ZAQATALA OLIMPIC LLC ZAQATALA, AZERBAIJAN Construction of the Sport Hall at the territory of the School No 1 in Zaqatala 01.05.2012 - 01.12.2012
SHAMKIR CITY, AZERBAIJAN Construction of a new Oxford kindergarten and Hostel near Oxford School for 100-pupil 07.05.2012 - 15.06.2013
SHAMKIR CITY, AZERBAIJAN Construction of Memorial Park 01.07.2012 - 01.06.2013
INTERNATIONAL BANK OF AZERBAIJAN - HEAD OFFICE Essential repair works, reconstruction, furniture supply and installation, sewage system, HVAC system, fire-fighting system, lightning 01.03.2013 - 18.03.2015
INTERNATIONAL BANK OF AZERBAIJAN - BRANCHES Essential repair works, reconstruction, furniture supply and installation, sewage system, HVAC system, fire-fighting system 2001 - 2016
"FORUM-95" MTK Installation of the HVAC system, fire-fighting system and electrical boards and doors in the basement of the buildings 01.02.2012 - 16.02.2012
"KAPITAL MTK" GHREENHILL INN Guest House in Sheki, Azerbaijan Essential repair works, construction of cottages at the territory of the Hotel 01.07.2011 - 03.02.2014
DIA HOLDING Shahdag Winter-Summer Tourism Complex - Installation and exploitation of the outside sewer system 15.12.2010 - 25.04.2012
NATIONAL ONCOLOGY CENTER Construction and repair of hopper-type bunker and back office of the Clinic 30.08.2010 - 19.08.2011
OGHUZ CİTY, AZERBAİJAN Construction of Central Park in Oghuz city 01.04.2010 - 29.04.2011
KAPİTAL BANK - HEAD OFFICE AND BRANCHES Reconstruction and essential repair works 2009 - 2012
MINGECHEVIR "İZOLIT" ASC Essential repair works at the workshop No1 and reconstruction of workshops No 3 and 4 25.07.2008 - 30.10.2008
INTERNATIONAL BANK OF AZERBAIJAN Construction of a additional building of the the school in Qandakh village, Zaqatala region 22.05.2008 - 10.09.2008
EXECUTIVE POWER IN OGHUZ, AZERBAIJAN Essential repair and installation of heating system at Executive Power Building in Oghuz region 01.05.2008 - 30.10.2008
ALFA CONSTRUCTION Construction of residence complex in Zaqatala 15.09.2007 - 10.10.2014
"FEYSHN - 7" LLC Repair works at clothes shop 01.10.2007 - 20.05.2008
"CPC" MM, AZERBAIJAN, OGHUZ Construction of Glucose factory in Oghuz 11.12.2007 - 01.07.2009
NATIONAL ONCOLOGY CENTER Building of special bunker and additional rooms for X-ray equipment disposal 12.10.2007 - 31.08.2008
"SUMGAYIT KNITTED FABRIC" ASC Repair and reconstruction works at administrative and production buildings 27.06.2007 - 01.05.2010
EXECUTIVE POWER IN OGHUZ, AZERBAIJAN Essential repair works, service and supply of mini ATS device 01.06.2007 - 31.08.2007
"ALFA-LAYN" MINGECHEVIR "IZOLIT" Construction works at office building 27.02.2007 - 15.06.2007
INTER SPEEN, AZERBAIJAN, SAATLI Construction of cotton factory in Saatli 21.08.2006 - 01.11.2009
"BOT" LLC Construction of a new stock and productive corps 15.09.2006 - 15.11.2007
MINISTRY OF EDUCATION OF THE REPUBLIC OF AZERBAIJAN Construction of a new school in Khirdalan 28.04.2006 - 29.12.2006
INTERNATIONAL BANK OF AZERBAIJAN Construction of new schools in Balaken, Sheki, Gakh 01.08.2006 - 31.05.2007
SHEKI OLIMPIC COMPLEX Reconstruction of central boilerhouse 05.06.2006 - 30.10.2007
SHEKI OLIMPIC COMPLEX Maintenance and Services 01.07.2006 - 30.10.2007
"KONSUL" MTK Construction of 14 - storied building (concrete, rebar, form) 10.06.2006 - 31.06.2007
"NAIL" MMC Repair and building works (concrete, concrete reinforcement) 07.04.2006 - 30.08.2006
"MURADLI" COMPANY Construction of 18 - storied building (concrete, rebar, form) 04.15.2003 - 30.04.2004
OLIMPIC SPORT COMPLEX IN SHEKI, AZERBAIJAN Installation of Irrigation System, Maintenance Services, Reconstruction of central boilerhouse 26.04.2005 - 25.07.2005
"EVERTON" COMPANY Construction of 14 and 19 - storied building (concrete, rebar, form) 30.12.2004 - 15.07.2007
"FLAMINGO" AZERBAIJAN-LENKORAN Building of a Guest House, Olympic Sport Complex 08.18.2003 - 12.12.2003
ARRA (Azerbaijan Rehabilitation & Refurbishment Agency) Reconstruction of Oncology Clinic 05.07.2004 - 23.11.2005
STATE COMMITTEE OF CONSTRUCTION AND ARCHITECTURE Internal decoration works at Gulistan Palace, installation of WC pans and sinks, tiling 27.07.1998 - 25.08.1998
MISC. CONSTRUCTION Fencing of the area and gates installation – extension of previous contract due to some additional areas not included to the Project 22.12.2023 – ongoing